If you only add up the power bill for your server room, you are losing money
The real cost includes staff time on the air conditioner, a UPS that starts depreciating the minute it turns on, and the risk of one hour offline. Most companies have never closed that math.
- 10 Gbps ports available
- Redundant Power
- DDoS Protection
No signup. Use the numbers you already have.
What the power bill does not show
Electricity is the easiest line to find in the spreadsheet. It is not the most expensive one.
Staff hours on the facility
Filter changes, UPS batteries, a log of who walked into the room. That is expensive people doing building work, not product work.
UPS and cooling gear
The UPS starts depreciating the minute it turns on. Batteries, precision AC and a generator are not a one-off cost. They become a monthly reserve.
One hour offline
A power cut, a dead AC unit or an office ISP blip. One hour of downtime often costs more than a full month of electricity.
Server room TCO calculator
Enter what you already know. We add what usually stays off the spreadsheet and compare it with Tier III colocation.
4servers
Power for the room, AC and UPS. If you do not have the exact figure, use an estimate.
8
Filters, batteries, physical access, cleaning and CPD checks.
Servers, storage and switches. In colocation this CAPEX stays yours.
Stopped sales, idle staff, customer SLAs. Stay conservative.
Estimate adjustments
US$ 19
8
Estimated savings over 12 months
US$ 11,036
over 12 months, versus the server room
US$ 920 per month
On-prem room
US$ 1,710
Colocation
US$ 790
Suggested plan: 10U
Estimated setup fee: US$ 180
Where the number comes from
- Room powerUS$ 560
- Staff timeUS$ 152
- UPS and coolingUS$ 214
- Downtime riskUS$ 534
- Server depreciationUS$ 250
- Colocation 10UUS$ 540
- Hardware (still yours)US$ 250
* Free pickup at Equinix SP1, SP2, SP3, SP4, SP6; Ascenty SP1, SP2, SP3, SP4, SP5, SP6; Cirion/Lumen SAO1; Elea SP01, SP02, SP03; Matrix; Scala Tamboré and São Paulo, subject to feasibility confirmation. Other locations require an individual quote. Installation setup fees apply according to your plan.
Server depreciation shows up on both sides. Savings come from the room: power, staff, UPS and downtime risk.
Illustrative estimate for a sales conversation. It does not replace a TCO with real floor plan, kVA and layout.
Three numbers a server room rarely tracks
Idle CAPEX, incident-reporting duty, and the datacenter OPEX model.
CAPEX locked in hardware that depreciates fast
UPS units, generators and precision cooling are capital sitting in assets that do not generate revenue. In colocation that layer becomes OPEX: you pay for space, power and network instead of locking cash in a facility. The servers stay yours. If the goal is to drop hardware CAPEX too, the path is a dedicated server.
ANPD Resolution 15/2024
ANPD Resolution 15/2024 governs security-incident notice: the controller has 3 business days to notify ANPD and data subjects when an incident may cause relevant risk or harm. A room with no access control, cameras or visitor log makes it harder to detect, contain and report. In the datacenter, access is biometric, recorded and logged.
Keep the CPD vs move to OPEX
Keeping the room means running a facility: power, cooling, UPS, physical security and staff time. Moving to colocation hands that physical chaos to HypeHost's Tier III datacenter. You still own the hardware and pay a predictable monthly cost for space, power and network.
What changes when the room becomes colocation
Your team goes back to product work. Generators, chillers and the rack door become our problem.
Tier III, no planned-downtime window
Concurrent maintenance on generators and cooling. The datacenter stays up while the facility is serviced. That does not exist in an office closet.
Datacenter access, not a hallway
Biometrics, 24x7 CCTV, visit logs and control over who reaches the rack. No open room in the middle of the office.
Real power and cooling
UPS, generator and precision cooling. You stop running a facility and replacing batteries and filters in the middle of the workday.
10 Gbps ports and IX.br peering
More capacity for your websites, systems, and backups, with IX.br peering. 10 Gbps ports included with 10U and larger plans or available as an upgrade for 1U, 2U, and Ryzen 2U. If you need a direct carrier connection on campus, carrier-neutral colocation with cross-connect is available.
On-call staff, without overloading your team
Smart hands and human support. Reboots, physical checks and agreed part swaps without sending your team to the rack.
Access trail for personal-data operations
Visit logs, cameras and biometric control help show a physical security measure in audits and during incident response.
Want to know how much your company is leaving on the table?
Run the calculator and talk to sales with the numbers in hand. Or go straight to the colocation plans.
Frequently asked questions (FAQ)
See the most common questions about our server room TCO.
Room power, staff time on the environment, estimated UPS and cooling depreciation, server depreciation, and a downtime-risk slice. On the colocation side we add the plan suggested by server count, plus the same hardware depreciation, because the machines stay yours.
No. In colocation the server is yours: you pick the gear and the refresh cycle. What becomes OPEX is the facility (space, power, cooling, network and physical security). If the goal is to stop buying machines, the path is a dedicated server (bare metal).
No. It governs notice of a security incident that may cause relevant risk or harm to data subjects, with a 3-business-day deadline. A CPD with no access control, cameras or logs makes it harder to detect, contain and report. A datacenter with biometrics, CCTV and logs strengthens that posture, together with LGPD measures, but it does not replace policy, a DPO and internal process.
We align space, power and network, schedule hardware intake and support installation with smart hands. The outage window depends on your environment. Talk to sales for a window plan and checklist.
São Paulo (Osasco) and Fortaleza (Maracanaú), both Tier III. São Paulo is the main hub, with IX.br peering and the lowest latency for most of the country. Fortaleza covers the Northeast and international routes.
Yes. That is what colocation is for: your server, our datacenter. Plans run from 1U to a 47U rack, plus options for workstations, GPUs and towers. Confirm draw, height and connectors with sales before shipping.
Each plan includes a power band (for example 500W on 1U/2U and kVA on larger footprints). Extra power is quoted separately. In practice you stop paying for the whole room (AC, lighting, facility UPS) and pay the plan with the agreed power.
When you do not want to buy, depreciate and replace machines. Dedicated (bare metal) is 100% OPEX for hardware and facility. Colocation fits when the gear is already yours, still under warranty, needs a specific build, or the volume justifies your own CAPEX.
Up to 10U you can go prepaid, with no lock-in beyond the paid cycle, or monthly with a 12-month contract and a discount. 20U and 47U require a 12-month contract.
Physical help in the datacenter: reboot, cable check, agreed disk swap, receiving gear. Larger plans include hours. It keeps your team from traveling just to press a button.
Yes. Mac Mini, Mac Studio, and Mac Pro have their own colocation plans, from R$ 329/month, with volume discounts. Raspberry Pi is still quoted individually: open a ticket with the model, quantity, and approximate power draw.
See Mac plansWhat server-room TCO means
Total cost of ownership for a server room is everything the company spends to keep the CPD online: power, cooling, UPS, physical security, staff time and the risk of an outage. Looking only at the electricity bill understates the cost and distorts the comparison with colocation.
Colocation at HypeHost means moving your hardware into a Tier III datacenter in São Paulo or Fortaleza. You still own the servers. Space, power, cooling, uplink, AntiDDoS and smart hands become a monthly cost.
Hidden costs of an on-prem CPD
Besides power, the CPD burns staff hours on facility work, a reserve for UPS batteries and precision AC, and a downtime slice when the lights go out, the split dies or the office link flaps. Companies that never close that math mix building opex with IT opex and conclude colocation is expensive.
10 Gbps port for a one-time R$ 299 fee
A 10 Gbps connection from traditional carriers often comes with high monthly fees. At HypeHost's São Paulo colocation facility, upgrading to a 10 Gbps SFP+ port costs just a one-time fee of R$ 299, with no additional monthly charge for the port. Get more capacity to transfer files, run backups, and serve your websites and systems using hardware you already own.
The upgrade is available for 1U, 2U, and Ryzen 2U plans and requires an SFP+ compatible network card. The port uses HypeHost's shared network; dedicated bandwidth and cross-connects to other carriers are purchased separately.
Facility CAPEX vs datacenter OPEX
UPS units, generators and precision cooling lock capital in assets that depreciate and do not generate revenue. In colocation that layer becomes OPEX. Server hardware can stay on your books. Teams that also want to drop machine CAPEX look at dedicated servers (bare metal) on the same network.
ANPD Resolution 15/2024 and the server room
ANPD Resolution 15/2024 approved the Security Incident Notice Regulation. When an incident may cause relevant risk or harm to data subjects, the controller notifies ANPD and the subjects within 3 business days. The rule does not require a datacenter, but a CPD with no biometrics, cameras or access log slows detection and evidence. A datacenter with access control, 24x7 CCTV and visit logs supports the security posture LGPD expects, without replacing internal process, a DPO and encryption.
Compare keeping the CPD with moving to colocation
Keeping the CPD means running a mini facility: power, cooling, UPS, the door, cameras and the time of whoever changes filters. Moving to colocation hands that operation to HypeHost's Tier III datacenter. An honest comparison puts room power, staff, facility depreciation, downtime risk and the space fee in the same month. The calculator on this page does that cut in minutes, as a starting point for sales to close kVA, U and layout.
To book U space, power, and ports, use the catalog. See colocation plans
Who this math is for
- Companies with a server room in the office that already feel the weight of power and AC
- IT teams spending billable hours on UPS units, filters and physical access instead of product
- Operations that process personal data and need an access trail and incident response
- Teams that already bought servers and want a datacenter without giving up the hardware
- Projects comparing a CPD refresh (facility CAPEX) with a colocation monthly fee (OPEX)
Mac Mini, Mac Studio, and Raspberry Pi colocation
Mac Mini, Mac Studio, and Mac Pro have their own colocation plans, from R$ 329/month, with volume discounts. Raspberry Pi is still quoted individually, with model, quantity, and approximate power draw.
See the Mac plans or open a ticket for Raspberry Pi.
Where the hardware lives
HypeHost datacenters in São Paulo (Osasco) and Fortaleza (Maracanaú) are Tier III, with redundant power, precision cooling, biometrics and CCTV. São Paulo concentrates IX.br peering and the lowest national latency. Fortaleza covers the Northeast and international routes. Carrier-neutral colocation on the SP1-SP5 campus is also available for teams that need a direct cross-connect to other carriers.
What HypeHost colocation includes
- Space from 1U to a 47U rack, with power and network set in the plan
- AntiDDoS included and uplink on the HypeHost network
- Biometric access, CCTV and visit logs
- Smart hands for reboots, checks and receiving gear
- Prepaid with no lock-in up to 10U, or a 12-month contract with a discount
Why close this math with HypeHost
Because the choice between a CPD and colocation should not be a guess about the power bill. HypeHost runs colocation in Tier III datacenters in Brazil, with its own network, IX.br peering, human support and plans from 1U. The calculator on this page makes TCO visible. Sales closes the real fit for space, power and migration.